Union Pacific
Railroad - Multiple Land acquisition projects
performed
in Bexar, Wood, and Tarrant Counties. Projects included
creating boundary surveys, right-of-way documents and easement documents
for a future siding track, or an extension of an existing siding track.
North Texas Municipal Water
District - 96" Pipeline for Texoma
water from Grayson County to
Wylie Water Treatment Plant, a 30 mile project. Topographic mapping of
all creek and road intersections, abstract map, preparation of
Easement/R.O.W. documents, construction staking.
Tarrant Regional Water
District, Twin Points Project at Eagle
Mountain
Park. Topographic
surveying and construction staking performed between January and March,
2010.
Parker County Bond Issue,
West Loop Project in Weatherford, TX.
Topographic and boundary surveys,
and preparation of right-of-way documents, performed in 2009 &
2010, for Freese & Nichols Engineers. Total approximate fee was over
700,000.
North Texas Municipal Water
District, The Lower Bois d'Arc
Creek Reservoir near the City of Bonham,
Fannin County, Texas. Boundary surveys and some topographic work for the
process of acquiring the land, performed in March 2009.
North Texas Municipal Water
District, The Renner Road 5 mile
waterline project for replacement of
Plano West side Pipeline, NTMWD project no. 173. Topographic surveys
performed in January-February, 2009, and preparation of easement
documents.
City of
Mansfield. Numerous Street, water line,
sewer line, and drainage projects for the City of Mansfield, during the
year 2008
& 2009. Topographic surveys and construction staking for
projects designed by the City or their contracted design engineer. Total
approximate annual fee billed to the City of Mansfield was over $250,000.
North Texas Municipal Water
District, Sanitary Sewer Force
Main Project along State Highway No. 121
(30,000 linear feet). Total fee over $170,000 performed from August 6,
2006 to January 30, 2007 for Freese & Nichols Engineers, Fort Worth,
Texas. Worked performed: topographic surveys, property deed abstract,
location of property lines, and prepare easement documents.
North Texas Municipal Water
District, City of Garland,
University Channel Improvement Project (1,800
linear feet). Total fee around $130,000 for work performed from August
6, 2006 to January 30, 2007 for Freese & Nichols Engineers, Fort Worth,
Texas. Worked performed: topographic surveys, property deed abstract,
location of property lines, and prepare easement documents.
North
Texas Municipal Water District, Recycled Waterline
Project from Lake
Tawakoni to FM 2728 (53,500 linear feet). Total fee over $400,000.
Performed from February 22, 2006 to January 15, 2007 for Freese &
Nichols Engineers, Fort Worth, Texas. Worked performed: topographic
surveys, property deed abstract, location of property lines, and prepare
easement documents.
City of
Mansfield. South Matlock Road Street,
Utility and Drainage
Improvement Project, from East Broad Street to S.H.
360 for the City of Mansfield. Total fee around $200,000. Performed from
May 2004 to December 31, 2006. Worked performed: topographic surveys,
property deed abstract, location of property lines, prepare easement
documents, and construction staking.
North Texas Municipal Water
District, Recycled Waterline Project from Royse City to Lake Lavon at
Farmersville, Texas
(70,000 linear feet). Total fee over $350,000.
Performed from December 1, 2004 to August 31, 2005 for Freese & Nichols
Engineers, Fort Worth, Texas. Worked performed: topographic surveys,
property deed abstract, location of property lines, and prepare easement
documents.